- EMS ISD Bond Progress
- Specialty Campuses and District Facilities
Campus Pages
Page Navigation
-
Agricultural Facility
Proposed 2017 Bond Projects for Agricultural Facility include:
- New metal wall panels
- Paint structure
- Sidewalk and fencing improvements
- Exterior improvements and signage
-
Central Administration
Proposed 2017 Bond Projects for Central Administration include:
Replacement Facility for Central Administration
- Build a Replacement Facility to centralize and house all administration due to growth and operational functionality.
- Central office employees currently are located in eight different buildings throughout the District. Additional space is no longer available and areas designated for professional development and even storage are being repurposed into offices or workspaces. This makes it difficult for departments to effectively and efficiently work together. In addition, the administration complex on Old Decatur is split into five different buildings; three of those are portables.
- District administrators have always put student environments first, and those areas will be prioritized. Administration can continue to be effective for a number of years. The bond project phasing currently being considered puts the new administration building possibly opening in 2025.
Replace Carpet
- The current carpet, which is now 16 years old and past its life span, will be replaced at the current building. The current Central Administration building will continue to be occupied for approximately eight more years.
-
Hollenstein Career and Technology Center
Proposed 2017 Bond Projects for the Hollenstein Career and Technology Center include:
- Exterior improvements and signage
-
John Price Maintenance and Transportation Facility
Proposed 2017 Bond Projects for John Price Maintenance and Transportation Facility
- The John Price Maintenance and Transportation Facility opened within the last 10 years and therefore there are no designated bond projects at this facility.
-
Watson High School/Alternative Discipline Center
Proposed 2017 Bond Projects for Watson High School/Alternative Discipline Center include:
- Create controlled vestibule with access control
- Replace flooring
- Replace rooftop units
-
Weldon Hafley Development Center
Proposed 2017 Bond Projects for the Weldon Hafley Development Center include:
- Access control within controlled vestibule
- Additional security cameras
- Replace flooring
- Replace rooftop units