Proposed 2017 Bond Projects for Boswell High School include:
Replace orchestra pit cover
Outdoor lighting to band practice area
Replace auditorium seats (not replaced during previous renovations)
Additional security cameras
Replace sound system in gym
Refinish gym floors
Replace rooftop units
Roof replacements and repairs
Exterior improvements, signage, fencing and paving
Athletics Addition and Renovation to meet program and enrollment needs and bring to new high school standard:
Add synthetic turf to baseball and softball fields
Add synthetic turf to minor competition field
Replace gymnastics floor
Replace synthetic turf on main competition field and repair base
Replace tennis court windscreens
Resurface track
Stadium renovations to provide distinctive entrances and ticket booths on both the home and visitor sides, new visitor concessions and restrooms
Expanded locker rooms, turf room, weight room and training areas These areas have not been touched in previous campus renovations
Chisholm Trail High School
Proposed 2017 Bond Projects for Chisholm Trail High School include:
Exterior improvements, signage and fencing
Add synthetic turf to baseball and softball fields
Add synthetic turf to minor competition field
Replace synthetic turf on main competition field
Resurface tennis courts and replace windscreens
Resurface track
Eagle Mountain High School
Proposed 2017 Bond Projects for Eagle Mountain High School include:
In the next four years, the District’s high schools will be at or near capacity. The 2017 bond will fund the construction of the District’s fourth comprehensive high school to accommodate the growing District.
Eagle Mountain High School will be located off Bond Ranch Road near the new Boat Club Road extension that is planned. Demographer projections estimate that 9,000 future homes will be built in this area. The District purchased 140 acres for the high school site through a previous bond program.
The planning and design process will begin in 2019, and the campus is projected to open in 2024.
Demographic projections predict that at ultimate build-out the District will be at a maximum of four high schools. The opening of Eagle Mountain High School will assist the District in reaching pure feeder patterns at ultimate build-out.
海角直播 High School
Proposed 2017 Bond Projects for 海角直播 High School include:
Replace sound system in auditorium and gym
Replace lighting in gym and corridors
Refinish and repair gym floors
Replace flooring
Replace all security cameras
Replace Heating, ventilation, and air conditioning (HVAC) digital controls
Replace rooftop units
Replace public address system
Roof repairs
Exterior improvements, signage, fencing and paving
Athletics Addition and Renovation to meet program and enrollment needs and bring to new high school standard: